Product documentation
In This Topic
    Service Management Preventive & Planned Maintenance
    In This Topic

    Preventive & Planned Maintenance in HSO Service Management supports the preparation, forecasting and execution of scheduled service activities. Maintenance can be based on contractual obligations, calendar frequencies, predefined intervals or equipment usage. The process converts maintenance requirements into planned visits and, when required, into Service Calls and Service Tasks.

     

    Preventive & Planned Maintenance Overview

    Introduction

    Preventive Maintenance is used to perform inspections, servicing, calibration and replacement activities before equipment failure occurs. It is commonly driven by Service Contracts, which define the maintenance obligations for covered Service Objects. Planned Maintenance can also be used outside a contract for service campaigns, recalls or other activities involving selected Service Objects.

     

     

    Maintenance process

    The maintenance process begins with defining a Service Schedule and selecting the relevant Service Objects. Based on the applicable maintenance rules, the system generates a forecast containing the expected maintenance visits. These planned visits can subsequently be converted into Service Calls and Service Tasks for operational execution. The Event Code identifies the maintenance activity and determines the work package associated with the Service Task. For contract-driven maintenance, the Service Contract also provides the applicable coverage and financial conditions.

     

    Maintenance methods

    HSO Service Management supports Frequency-Based and Interval-Based Maintenance. Frequency-Based Maintenance can use static or dynamic scheduling, while Meter-Driven Maintenance extends dynamic frequency scheduling by considering equipment usage.

    The appropriate method depends on whether maintenance follows a recurring calendar pattern, defined lifecycle intervals or actual equipment usage.

     

    Service Schedules

    Introduction

    Service Schedules define the maintenance pattern applied to Service Objects. They determine which activities must be performed and the frequency or conditions under which maintenance visits are generated. A Service Schedule must be linked to the relevant Object Types before it can be selected for those objects.

     

     

    Schedule content

    A Service Schedule contains the maintenance activities represented by Event Codes and their scheduling rules. The combination of Event Code and Object Type determines the associated work package, including estimated duration, materials, Service Operations and resource requirements. This provides a consistent basis for the work generated from planned maintenance visits.

     

    Schedule selection

    Service Schedules can be selected when preparing contract Visit Schedules or other planned maintenance activities. The selected schedule must be appropriate for the Service Object and its maintenance requirements. The Service Schedule defines the maintenance rules, while the Visit Schedule determines how those rules are applied to selected Service Objects. The resulting forecast should be reviewed before planned visits are confirmed or converted into operational work.

     

    Frequency-Based Maintenance

    Introduction

    Frequency-Based Maintenance generates planned visits according to a recurring calendar pattern. It is suitable for activities such as monthly inspections, quarterly servicing or annual maintenance, where the required frequency is defined independently of actual equipment usage.

     

     

    Maintenance frequency

    A frequency schedule defines how often particular maintenance activities must occur within a period. Multiple Event Codes can be included, each with its own frequency. For example, a Service Object may require quarterly inspections and an annual major service. The Service Schedule defines the required maintenance activities and their recurrence.

     

     

    Visit distribution

    When the maintenance forecast is generated, the system distributes the required visits across the applicable period. Where maintenance activities overlap, the configured schedule can determine whether a more extensive service replaces another planned activity to avoid duplicate visits. This allows multiple maintenance requirements to be coordinated within the same schedule.

     

    Static and dynamic scheduling

    Frequency-Based Maintenance supports two scheduling approaches:

    Dynamic scheduling is described in more detail in the Dynamic Frequency Maintenance section.

     

    Planning considerations

    Forecasted dates are subject to the applicable scheduling conditions, including calendars, permitted visit days and visit margins. The planner should review the resulting dates before generating operational work to ensure that the planned maintenance activities align with the customer's operational requirements.

     

    Interval-Based Maintenance

    Introduction

    Interval-Based Maintenance generates visits according to defined intervals or lifecycle milestones rather than an evenly distributed calendar frequency. It supports maintenance patterns in which different activities must occur at different stages of a Service Object's lifecycle.

     

     

    Interval definitions

    Intervals can represent elapsed time, object age, usage or counter-based milestones. For example, a Service Object may require an initial inspection after one month, a second inspection after six months and a major service after two years. Depending on the schedule, the sequence can repeat or end after the defined maintenance cycle.

     

    Object information

    Interval calculations depend on the relevant Service Object information, such as installation date, starting counter value or estimated usage. Incorrect or incomplete object information can affect the calculated visit dates. The relevant starting information should therefore be reviewed before generating the maintenance forecast.

     

    Visit forecasting

    The maintenance forecast translates the configured intervals into planned visits. The first calculated visit should be reviewed carefully because subsequent visits may depend on the same starting point or maintenance sequence. This is particularly important when the schedule contains different intervals or lifecycle milestones.

     

    Dynamic Frequency Maintenance

    Introduction

    Dynamic Frequency Maintenance is a scheduling option within Frequency-Based Maintenance. Instead of retaining the original planned dates, it recalculates future maintenance visits based on the actual realization date of the preceding visit. This allows the maintenance schedule to follow the actual execution of service activities rather than a fixed calendar pattern.

     

    Dynamic recalculation

    When a maintenance visit is completed earlier or later than planned, the remaining visits are recalculated accordingly. For example, if maintenance is scheduled every three months but a visit is performed three weeks late, the subsequent visits are shifted three weeks later. When maintenance is completed earlier, the remaining visits can be brought forward.

     

     

    Impact on visit frequency

    Because future dates depend on actual execution, the number of maintenance visits performed during a contract period can differ from the original forecast. This is relevant for contract pricing and may require a commercial arrangement based on the number or type of visits performed. The potential impact on contractual obligations should therefore be considered when selecting dynamic scheduling.

     

    Operational considerations

    After completing a dynamic maintenance visit, the updated forecast should be reviewed before generating additional Service Calls or Service Tasks. This ensures that future work follows the revised maintenance schedule and helps prevent operational work from being generated using outdated forecast dates.

     

    Meter-Driven Maintenance

    Introduction

    Meter-Driven Maintenance is a dynamic frequency-based scheduling mechanism that considers equipment usage when determining the next maintenance date. It is suitable for Service Objects whose maintenance requirements depend on running hours, kilometres, production cycles or other measurable usage.

     

     

    Meters and counters

    The Service Object must contain the appropriate meter or counter information, including the primary meter component required by the maintenance schedule. Meter readings are recorded against the relevant component and provide the usage information used for maintenance calculations. The availability and accuracy of these readings influence the reliability of the forecast.

     

    Maintenance calculation

    Meter-Driven Maintenance combines the configured calendar frequency with a usage threshold. The system estimates when the threshold will be reached using the available meter readings. If the expected threshold date occurs before the next frequency-based maintenance date, the visit is brought forward. Otherwise, the frequency-based date remains applicable. This allows maintenance to respond to equipment usage while retaining the configured calendar frequency as a reference.

     

    Dynamic forecasting

    When new meter readings become available, the expected usage and maintenance dates can be recalculated. Changes in equipment usage may therefore result in earlier maintenance visits or changes to the number of visits required during the contract period.

     

    Data quality

    Accurate and regular meter readings are essential for reliable forecasting. Incorrect starting values, missing readings or unexpected counter changes can affect the calculated maintenance dates. These should be reviewed before operational work is generated.

     

    Visit Schedules & Object Selection

    Introduction

    Visit Schedules connect Service Schedules with the Service Objects for which maintenance must be performed. They are commonly created within Contract Proposals or active Service Contracts and determine the planned maintenance obligations for the selected object content.

     

     

    Creating a Visit Schedule

    A Visit Schedule is created by selecting the applicable Service Schedule and entering the rollout start date. The user then selects the Service Objects to which the schedule applies. Where supported, automatic schedule selection can identify eligible schedules based on the configured object and maintenance relationships.

    For contract-driven maintenance, Visit Schedules form part of the contractual maintenance obligations. The preparation of these schedules within a Contract Proposal is described in the Service Contracts chapter.

     

    Object selection

    The object selection determines which Service Objects are included in the maintenance forecast. This selection must correspond to the intended maintenance scope and, for contract-driven maintenance, the covered contract content. Selecting the appropriate objects ensures that maintenance visits are generated for the intended equipment.

     

    Forecast options

    Additional options can define permitted visit days, working times, calendars and visit-day margins. These conditions influence the calculated planning dates and help align maintenance activities with the customer's operational requirements.

     

    Maintenance Forecasting

    Introduction

    Maintenance Forecasting calculates the expected visits based on the selected Service Schedule, Service Objects and scheduling conditions. The forecast provides visibility into future maintenance obligations before they are converted into executable work. It forms the connection between maintenance requirements and operational planning.

     

     

    Static visit lines

    For static schedules, the Create Lines function generates a preliminary set of visit lines for a reference year. These lines can be reviewed and adjusted before the forecast is created. The user can modify the planned sequence or revisit the schedule settings when the calculated dates do not meet the requirements.

     

    Creating the forecast

    The Create Forecast function generates proposed maintenance visits, including planned dates and associated capacity requirements. These visits become visible in the planned maintenance context and can be reviewed before contract promotion or operational rollout. The forecast represents planned maintenance obligations rather than executable Service Calls or Service Tasks. Operational work is generated separately when the visits are due.

     

     

    Dynamic forecasts

    Dynamic schedules do not use the same static visit-line preparation. Their forecast depends on the configured maintenance rules and, where applicable, actual realization dates or meter readings. Future visits can change when new operational information becomes available. The updated forecast should be reviewed before additional maintenance work is generated.

     

    Planned Maintenance Overview & Rollout

    Introduction

    The Planned Maintenance Overview provides access to forecasted visits and supports the conversion of maintenance obligations into Service Calls and Service Tasks. Planned visits are identified by Visit IDs, allowing users to track which obligations have already resulted in operational work.

     

    Reviewing planned visits

    Users can review planned maintenance from the relevant Service Contract or through the periodic planned maintenance sessions. The overview supports filtering by information such as date, Event Code, Service Object, contract and task creation status. This helps identify visits that are due for execution and those that have already been processed.

     

    Creating Service Calls and Tasks

    When a planned visit becomes due, it can be converted into a Service Call and the associated Service Task. The Event Code determines the task's work package, while the Service Object and applicable contract provide the operational and financial context. Before creating work, the user should confirm that the visit is required and has not already been processed. Once created, the Service Call and Service Task follow the standard Service Management process.

     

    Cancelling planned visits

    Planned Visit IDs can be cancelled when the corresponding maintenance activity should not be performed. The user should review the resulting maintenance overview to ensure that remaining obligations are still correctly represented and that cancelled visits do not result in unnecessary operational work.

     

    Maintenance Execution & Completion

    Introduction

    Once planned maintenance has been converted into a Service Call and Service Task, execution follows the standard Service Management process. The Service Task contains the planned work and provides the basis for registering labor, materials, Service Operations and other execution results.

     

    Task execution

    The assigned technician performs the maintenance activity and registers the required results against the Service Task. Depending on the Event Code and Object Type, this can include inspections, measurements, component activities, counter readouts and material consumption.

    The standard execution process, including task statuses and transaction registration, is described in the Service Tasks & Execution chapter.

     

    Realization

    Completing and realizing the Service Task records the performed work and its associated project transactions. For dynamic maintenance, the actual realization date can also influence the calculation of future visits. This connects operational completion with the maintenance forecast.

     

    Maintenance history

    Completed Service Calls and Service Tasks provide the operational history of maintenance performed on the Service Object. This information supports subsequent maintenance decisions and provides a record of the activities carried out under the applicable contract or maintenance schedule.

     

    Planned Service Campaigns

    Introduction

    Planned Service Campaigns support maintenance or service activities that must be performed across a selected group of Service Objects outside the normal recurring contract schedule. Examples include product recalls, technical inspections and one-off service programs.

     

     

    Campaign scope

    The campaign identifies the relevant Service Objects and the work to be performed. Object selection can be based on configured criteria, allowing a defined population of assets to be included in the service activity.

     

    Operational rollout

    The selected Service Objects can be used to generate Service Calls and Service Tasks for the required work. The associated Event Code provides the standard work package, helping ensure consistent execution across the selected objects. Once created, these Service Calls and Service Tasks follow the standard Service Management execution process.

     

    Financial processing

    Campaign-related work uses the applicable Project Integration and financial configuration. Where the activity is not covered by a Service Contract, its chargeability must be determined through the relevant Service Management and project settings.